Succcessful Pressure Test at 36 t/h LignoFluid HP Boiler in Strakonice

The Pressure Test of the 36 t/h TwinFluid high pressure steam boiler in Strakonice has been completed successfully by TENZA. The final installation is now underway to ensure that commissioning can be carried out in the early month of 2013.

Some photos from the current state of the installation are shown below.

Go back