BurnerMax GmbH supplies robust excess air controller for difficult fuels.
Read moreAlera GmbH supplies 2 x 50 MW solid fuel fired hot gas generators with thermal oilheating in furnace membrane walls for Egger in Hexham (UK) and Rion (F)
Read moreAlera GmbH increases the capacity of a hot gas generator from 20 to 27 MW and optimises the plant performance by installing new instrumentation and control, including a PC visualisation system at the Pfleiderer factory in Gschwend.
Read more