Germany 2004 - 2009 - milestones

Alera GmbH / BurnerMax GmbH


2004 BurnerMax flue gas controller

BurnerMax GmbH supplies robust excess air controller for difficult fuels.

Read more

2006 Turn key energy plant for the wood panel industry

Alera GmbH supplies 2 x 50 MW solid fuel fired hot gas generators with thermal oilheating in furnace membrane walls for Egger in Hexham (UK) and Rion (F)

Read more

2009 Optimisation of energy plant

Alera GmbH increases the capacity of a hot gas generator from 20 to 27 MW and optimises the plant performance by installing new instrumentation and control, including a PC visualisation system at the Pfleiderer factory in Gschwend.

Read more